50kwh 100kwh 150kwh Energy Storage Solution UPS Backup Power for Factory Industry
Product introduction:
EverExceed All-in-one EverPower Industrial & Commercial ESS highly integrates PCS, LiFePO4 batteries, EMS, and other accessories. It is a high-power backup power solution serving commercial / industrial I grid-level customers. That high voltage energy storage system enables the highest flexibility both for rack-mounted and cabinet-based constructions. This system is much "Safer, Smarter, Simpler" and suitable to solve the power problems in your substations, outdoor areas, microgrids + energy storage, small factories, shopping malls, solar storage charging stations, etc.
Technical features:
Wide Compatibility |
Cold start function |
Multiple protection |
Wide battery voltage range enables it to be compatible with more operation environment; Fully compatible with lead acid & lithium-ion batteries. |
Off-grid cold start function, support multi-machine parallel function. |
Overcharge, Over discharge, Overload, Short-circuit, High temp., Low temp. protection etc. |
Dual power backup |
Energy consumption |
High efficiency |
AC and DC dual power backup to ensure the power supply of the control system. |
Low power consumption fan, with intelligent temperature control system. |
The highest power density, the highest efficiency is 97.5% |
Independent inverter functions |
Smart communication interface |
Compact size |
With grid-connected charging and discharging, off-grid independent inverter functions. |
Flexible communication, can accept BMS commands in real time, communication methods are RS485, CAN. |
Small size, easy to install, transport and maintain. |
Product Parameters
Product Model |
CO25K-50E |
CO50K-100E |
CO100K-215E |
CO150K-300E |
Electrical Parameter |
Nominal AC power |
25 kW |
50 kW |
100 kW |
150 kW |
Grid type |
3W+N |
Nominal grid voltage |
400 Vac |
Nominal grid voltage range |
360 Vac - 440 Vac |
Nominal grid frequency |
50 Hz / 60 Hz |
Nominal grid frequency range |
45 Hz - 55 Hz / 55 Hz - 65 Hz |
Rated AC output current |
36.2 A |
72 A |
152 A |
200A |
Max.THD of curretnt |
<3% (at nominal power) |
Battery Parameter |
Cell Chemistry |
Lithium Iron Phosphate (LFP) |
Battery voltage |
512 Vdc |
358 Vdc |
768 Vdc |
563 Vdc |
Battery ampere hour capacity |
100 Ah |
280 Ah |
280 Ah |
560 Ah |
Battery energy capacity |
51.2 kWh |
100 kWh |
215 kWh |
315 kWh |
Duration @ Rated Power |
2 hrs |
Cycle Life |
6000+ cycles |
10000+ cycles |
10000+ cycles |
10000+ cycles |
Calendar Life |
15+ years |
20+ years |
Compliance |
IEC62619,UL9540A,UL1973,UN38.3 |
Mechanical parameter |
Monitoring system |
Energy management system |
Cooling method |
air-conditioner |
Fire fighting system |
yes |
Noise emission |
≤75dB |
Communication interfaces |
Ethernet, RS485 |
Operating temperature range |
-20ºC to 50ºC (>45ºC derating) |
Allowable relative humidity range |
0 - 95 % (non-condensing) |
Degree of protection |
IP54 |
Max. working altitude |
3000 m |
Dimensions (W*D*H) |
800x1200x2100 mm |
1000x1450x2100 mm |
1738x1250x2330 mm |
* |
Weight |
800 kg |
1200 kg |
2400 kg |
* |
Solar parameter (Optional) |
Max. PV input power |
30 kW |
60 kW |
120 kW |
240 kW |
Max. PV input voltage |
850 Vdc |
1000Vdc |
MPPT voltage range |
200 Vdc - 830 Vdc |
200 Vdc - 950 Vdc |
Number of MPPT |
1 |
2 |
1 |
2 |
Number PV input of per MPPT |
2 |
2 |
4 |
4 |
Max. current per PV input |
25 A |
25A |
50A |
50A |
* The size and weight will be customised according to the requirements. |
Application:
· Solar+ Storage for applications with uninterrupted power supply.
· Solar + Storage+ generators for Off-grid applications with cheap power supply.
· Peak load shifting for TOU (Peak-to-Valley) tariff arbitrage to saving electricity cost.
· Peak shaving for reduce demand charge
· Backup power.

Successful Cases:
Shipping & Payment |
Payment |
T/T, L/C , Cash, Western Union etc.(flexible payment term can be discussed) |
Port |
Normally Shenzhen China (any sea port upon request) |
Delivery |
By sea/air/trian/truck transportation |
Delivery time |
Normally 4 weeks ex factory excluding shipping. |
Packing: |
Pack in carton box then pallet (wooden box) |
